Sign In | Join Free | My benadorassociates.com
China ZHANGJIAGANG FLAME MACHINERY CO.,LTD. logo
ZHANGJIAGANG FLAME MACHINERY CO.,LTD.
ZHANGJIAGANG FLAME MACHINERY CO.,LTD. Calender, Internal Mixer Professional Manufacturers
Active Member

11 Years

Home > Rubber Injection Moulding Machine >

200T oil press production silicone egg steamer mold automatic access

ZHANGJIAGANG FLAME MACHINERY CO.,LTD.
Contact Now

200T oil press production silicone egg steamer mold automatic access

  • 1
  • 2

Brand Name : TuoWei

Model Number : P3-200T

Place of Origin : CHINA

MOQ : 1group

Price : 24300USD

Payment Terms : T/T

Supply Ability : 99

Delivery Time : 25-30Work

Packaging Details : simple packaging

Type : 200T

Clapping force(TON) : 2000

Stroke(MM) : 250

Dimeter of cyhnder(MM) : 355

Heater power(KW) : 25

Total power(KW) : 42

Contact Now

TWP-200T Type
200 Clapping force(TON)
250 Stroke(MM)
550×560 Working Plate Size(MM)
355 Dimeter of cyhnder(MM)
10×2 Horse powet(HP)
25 Heater power(KW)
42 Total power(KW)
2RT/3RT/4RT Type of mold openning
7000 Gross weight(KG)
2900*2200*2000 Machine size(MM)

Vulcanizing machine daily inspection and maintenance A. routine inspection and maintenance 1) check whether the photoelectric mold closing device is sensitive and reliable; 2) check the part of the electric heating board to see whether the fixing of the electric heating board is firm and whether the wiring is short circuit; 3) check whether there is oil leakage in motor oil pump, piping and valve;4) check the height of fuel tank level;5) check the flow of cooling water;
6) check for abnormal sounds in motor oil pump, piping, valve, etc.;
7) the machine up and running, hours after the oil temperature should be generally within 35 ° C ~ 50 ° C;
8) check whether the system pressure is normal.
B. weekly inspection and maintenance
1) if the solenoid valve is heated, check its vibration and wiring;
2) whether the fastening screw of limit switch is loose;
3) whether the pipe joint is loose;
4) whether the filter is blocked.
C. Check and maintain monthly
1) check the oil pollution of the work;
2) cleaning inside and outside the machine;
3) check screw and barrel.
D. annual inspection and maintenance
1) whether the circuit wiring is loose;
2) setting state of limit switch;
3) check the wear condition of the mechanical part, whether the fixed screw is loose, and tighten it.

200T oil press production silicone egg steamer mold automatic access

200T oil press production silicone egg steamer mold automatic access


Quality 200T oil press production silicone egg steamer mold automatic access for sale

200T oil press production silicone egg steamer mold automatic access Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: ZHANGJIAGANG FLAME MACHINERY CO.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)